Bahia

Solar

145 MWp

Operational Overview

Source

Solar

Capacity

145MWp / 115 MWac

Certification

Fotovoltec – 7 years of measurements

Average Generation 35 Years

P(50) 33.4% (36.3MWm)
P(90): 31.0% (33.7 MWm)

Transmission Line

27 km (138kV, DIT)

Estimated COD

4T 2027

ready to build

Irecê III

It is located adjacent to the Irece 1 project (under construction) on land leased from a single owner.

Previously, the area was a bean plantation, which implies the absence of native forest, mitigating environmental risks

5

Operation Phase

Ready to build

5

Park Connection

Irecê III will be connected to the same SE at 138kV (DIT), therefore not participating in the distribution of losses up to the center of gravity of the NE submarket.

5

Park Equipment

Both parks will be equipped with bifacial solar modules, which benefit from the region’s soil, which is rich in limestone with excellent reflectivity, thus increasing the energy production (capacity factor) of the parks.