Complexo Solar Irecê – Phase 2

João Dourado - Bahia

Solar

193,6 MWp

Operational Overview

Source

Solar

Capacity

193,6 MWp / 161 MWac

Certification

Fotovoltec – 7 years of measurements

Average Generation 35 Years

P(50) 33.4% (51.9MWm)
P(90): 31.0% (49.0 MWm)

Transmission Line

27 km (230 kV)

Estimated COD

July 2027

SPE 1

UFV Solar Irecê 1 – 69 MWac – AUTHORIZATION RESOLUTION No. 11,462, OF APRIL 5, 2022

SPE 4

UFV Solar Irecê 4 – 46 MWac – AUTHORIZATION RESOLUTION No. 11,464, OF APRIL 5, 2022

SPE 5

UFV Solar Irecê 5 – 46 MWac – AUTHORIZATION RESOLUTION No. 11,465, OF APRIL 5, 2022

Ombudsman Channel – Implementation Phase

Use this channel for suggestions, questions, or complaints about the project’s implementation work.

(74) 99946-2004

solarirece2@illian.com.br

Environmental licensing

Consult the project’s environmental licenses

Under construction

Complexo Solar Irecê – Phase 2

It is located adjacent to the Irece 1 project (under construction) on land leased from a single owner.

Previously, the area was a bean plantation, which implies the absence of native forest, mitigating environmental risks

5

Project Phase

Construction of the construction site

5

Park Connection

The Irecê II connection will be carried out at the Irecê Substation, at 230kv and already has an Access Opinion and CUST signed.

5

Park Equipment

Both parks will be equipped with bifacial solar modules, which benefit from the region’s soil, which is rich in limestone with excellent reflectivity, thus increasing the energy production (capacity factor) of the parks.