Gilsun
Piauí
Solar
171 MWp
Operational Overview
Source
Solar
Capacity
171 MWp
Average Generation 35 Years
P(50): 27,3% (37,5 MWm)
P(90): 25,1% (34,5 MWm)
Transmission Line
12 km (230 kV) connected to SIN² at the 500/230/69kV substation in Gilbués
Estimated COD
2Q 2027 (50% discount on TUST)
UFV is located in one of the regions with the highest level of solar irradiation in Brazil.
Available for Negotiation
Gilsun
The UFV Gilsun project is located on a high plateau, benefiting from lower temperatures, which increases the efficiency of the solar panels.
Operation Phase
Construction is scheduled to begin in the second half of 2026, and operations are expected to start in the first half of 2028.
Partnership
The Project is being developed together with Araxá Energia Solar, a consolidated player in the renewable generation sector in Brazil.